Designing and installing the correct CIPP product ensures that the that the pipeline has been fully rehabilitated, as opposed to being covered up.

PipeMedic has the internal capabilities to produce CIPP designs for both partially and fully deteriorated pipe line conditions.

 
 
qualitaet.jpg
 
 

Installations are carried out in accordance
with the  following specifıcations:

ASTM D5813-04
Standard Specification for Cured-In-Place Thermosetting Resin Sewer Piping Systems.
 
 
 
ASTM F1216-09
Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube.
 
 
ASTM F1743-08
Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP).
 
 
 
 

Training & Specifıcations 

PipeMedic prides itself in being a specialist in CIPP. In order to achieve full transparency, all operators, QA and management staff are trained by certified equipment and material suppliers to obtain a high level of competency in both the CIPP and robotic rectification. By empowering all employees with the knowledge and training a standard will be met, ensuring quality will be achieved at all levels. 

Certificates of Training Brawoliner® & Cosmic™